t: 01454 318 828

Stay in touch

Sign up for our newsletter to get roofing updates and information sent to your inbox.

By clicking this button, you are agreeing to receive emails from TRS, and that we can keep your email address on our database of subscribers.

Vygon, Swindon

Industrial gutter services for Vygon, Swindon

Guttering and capping at a fully refurbished office site. 

Sector: Industrial

Roof Type: Mix of flat and metal roofing

Service: Industrial gutter services

What was the job?

This industrial gutter services contract was for a refurbished office site with quite an interesting history; The old Motorola building in Swindon was opened by the Queen in 1998. It made a brief appearance in the 1999 James Bond film “The World is Not Enough”.

The French company Vygon has completely refurbished part of the site into training suites, which will be used by staff from across the world. Vygon is also using the building to expand its UK operations.

The job included extensive lining and parapet capping, using Garland UK’s new fast-curing product, Dura‑Coat. The Dura-Coat Liquid System is a very fast curing and elastic waterproofing system that can be applied at very low temperatures, as low as 0°C, which is perfectly suited to jobs like these, carried out during a typical British winter. The system holds outstanding performance characteristics and allows rapid curing in as little as 30 minutes.

Mission

Extensive lining and parapet capping at the refurbished Vygon (UK) site in Swindon.

Challenge

Working in wet and windy winter weather.

Result

Garland’s new Dura-Coat product applies cold and cures rapidly.

Clyst Vale Community College roofing

Replacing a mix of concrete panels and flat roofing at a busy school during term-time.

READ MORE

Bristol Odeon Cinema

Stripping and renewal of insulated flat roofs above a beloved Bristol cinema.

READ MORE