Farnham Leisure Centre

Roof correction to solve water ingress problem and insulation upgrade.

Sector: Leisure

Roof Type: Pitched Asbestos Roof

Service: Over cladding

What was the job?

TRS were approached by the client to provide costs and proposals to correct a continuing water ingress problem on the original roof installation. The project had a number of challenges – working on a fragile asbestos cement roof and over a fully functioning leisure centre, to name two. A special crane lift was also needed to accommodate the type of roof sheet and the fragile roof surface. Once final design was agreed, work was completed with no disruption to the leisure centre, and finished on budget and on time.

Mission

Correct continuing water ingress. Encapsulate bonded asbestos cement sheeting. Improve insulation values. Upgrade insulation.

Challenge

Working over a fully operational leisure centre. Working on and dealing with the existing asbestos roof.

Result

Corrected the water ingress problem on the roof and provided a corrective solution to ensure no further damage.

Fareham Reach

Working with our sister company TRS Construction Solutions, we delivered the reroofing and internal refurbishment of this 9,000m2 factory.

READ MORE

Odeon Cinema Bristol

Stripping and renewal of insulated flat roofs above beloved Bristol cinema.

READ MORE